More and more people are investing in concrete mixers, so there are a lot of things that are not clear to people who are building concrete mixers for the first time. I must have consulted a lot of people before purchasing the setting of concrete mixing station, but some matters need to be paid attention to may not be very clear. Next, we will elaborate on the issues that need to be paid attention to before using concrete mixing station:
1. Check whether all switches on the electrical control console are in the normal position:
2. Check whether the belt of the incense batching machine and belt conveyor is normal;
3. Check whether the access door of the mold mixer, the travel switch of the unloading door and the proximity switch are normal:
4. Check whether the lubricating grease in the concentrated lubricating oil of the mixer is especially sufficient
5. Check whether the lubricating oil of other operating components of concrete mixing station is sufficient:
6. Check whether the connecting bolts of each connecting part are fastened;
7. Check whether the manual butterfly valve of powder can is opened;
8. Check whether the air supply, water and admixture pipelines are normal;
9. Check whether the aggregate, powder, water and admixture are sufficient;
10. Before operating the concrete mixing station, check the strong electric cabinet to see whether all the switches are closed;
11. Open the power knob of the operating station, at which time the power indicator light should be on. Press the start button of air compressor on the door of the cabinet to check whether the air pressure is above 0.4mpa.
12. Turn on the power of the computer, start the computer and run the monitoring program, set the formula ratio according to the “computer operation”, and prepare to start the production of concrete.
Check all matters that need to be noted in the concrete mixing station before each use to make sure there are no problems before starting up.