Before starting the concrete mixing plant, it needs to check the following eight aspects: whether the limit position switch is normal, whether there is alarm on the computer running interface; concrete mixer to inclined belt, flat belt; began to mix station source air compressor pressure of 0.7MPa pressure, to meet the surrounding; the automatic production concrete switch is forbidden, prohibition of the specific file.