concrete batch Plants installation is the greatest guarantee the safe use later, so preparatory work prior to installation we also need to do the full job, then how will the concrete batch Plants installation to maximize the potential, we must do the rational and bar below haomei to resolve concrete mixing station preparations have?
- 1, the first given by the manufacturer in accordance with the concrete batch Plant installation foundation plans, and prepare the ground and embedded. Installed base must be solid, consistent architectural design specifications.
- 2, good planning construction of access roads, temporary schwing concrete placing booms bridge, wharf and stockpiling area, and undertake leveling, not only did water, electricity, land leveling.
- 3, assembly concrete batch Plants hoisting equipment, such as cranes, tower vehicles, the installation process is not only to choose the right position, the more important is that we must use professional operators to install.
- 4, concrete batch Plantis mainly responsible positions in their own due diligence to ensure that every job acceptance, the only way to ensure safe and efficient work. Security is no small matter concrete mixing plant, so we must not relax, only to lay a good foundation for a solid backing, so in order to produce efficiently must be taken seriously for each job.