Trailer concrete pump can generally be combined with regular maintenance repairing in oil, the new factory or big repair after running-in period, secondary maintenance for the first time in oil, oil change after can be in three levels of maintenance.
(1) First check the new oil grade, quality, not use other brands, but can not mix two brands.
(2) If the oil is dirty, after the release of the system should be cleaned with kerosene, then working oil or low-viscosity naphthenic oil (cleaning. For cleaning concrete boom pump clearance operation, namely around and go. To pump use a large suction filter, cleaning the oil filter after the facelift of the original design. Do not use cleaning tank cotton or cotton cloth. after cleaning the oil circulation can be used to clean the net, and use compressed air to blow out the tank.
(3) check the original hydraulic oil to the asphalt batch plant system, the general oil should be transparent color with pale yellow, cloudy or emulsion, understand its pollution degree of metamorphism, and then put the net.
HAOMEI Trailer Pumps deliver superb, powerful performance over a long lifespan. They provide smooth and reliable pumping, superior durability, unbeatable flexibility and exceptional convenience to meet the needs of even your most demanding job.