Trailer Concrete Pump as a leading concrete pumping machine, the concrete is transported through pipelines to transport, and pipeline is demand device is fixed on the pump before the pump pipeline mixing device how?
For the pipeline device, originally many customers in the purchase of the pump will be taken into account before the agitation of this question, and even worried about the pipeline will be very troublesome stirring pump. Originally, we do not have to worry about this question, because the pump is very simple mixing device. The main points of the pipeline device of the stirring pump are as follows:
1, the pipeline must be fixed and reliable, to prevent the pipeline showed a large shaking, so that the time of delivery of concrete safer.
2, the proper use of the elbow: because the concrete is containing water and sand stone in the process of delivery, then the appropriate device pipe, especially in the downhill time, can be useful to prevent water loss too fast, resulting in concrete strength.
3, stop the long pipeline overhead, because pipeline construction after demand concrete delivery at the moment, the weight of the pipe is increased, if a long pipeline is directly overhead pipeline will cause cracking and falling, so below each pipe must be flat pad reinforcement. It is reasonable to use this kind of mixing pump.
To meet the requirement of 4, to tighten the bayonet pipe Kalou, because the pipe concrete mixing pump is connected one by one, and in the interface card must be strong.
Above is how to answer the question of how to drag the
Trailer Concrete Pump pipeline, if you have other questions may want to learn more about the general situation, look forward to click on the online consultation with our customer service staff to communicate.