Before starting the concrete mixing plant, it needs to check the following eight aspects: whether the limit position switch is normal, whether there is alarm on the computer running interface; concrete mixer to inclined belt, flat belt; began to mix station source air compressor pressure of 0.7MPa pressure, to meet the surrounding; the automatic production concrete switch is forbidden, prohibition of the specific file.
The control system of concrete mixing plant should adjust “manual” to” automatic “; and then open the emergency stop button switch, at this moment, you should control the power supply by manual, PLC and instrument power supply display normal, open the ups, and open computer to check.
The system console emergency stop switch and key switch of concrete mixing plant should be in off state, and the wiring frame inside the console is in the off state, in the absence of any load condition, the power switch of host machine box should be off, but if it’s in load, the power switch is off, the machine cabinet may lead to collapse.
The attentions when the control system of the concrete mixing plant is checked are as follows: the operation of the mixed control system is not skilled, please operate strictly follow the following steps. You should ensure whether the input signal of computer is normal. Open the bottom valve of silo, admixture, and inlet valve. When the pump and inlet valve aggregate storehouse is filled, the host should be empty, the middle position of each object all needs to be carefully checked.
For more information about any of our products, please feel free to contact us or at the contact addresses available on this website.