Weighing is an important part of the production of concrete in mini concrete batching plant equipment, which directly determined the…
Many customers often ask how much they pay in a customary sentence when consulting products. If our customer service personnel…
After receiving the new project and arriving at the construction site, the fine stone concrete pump should pay attention to the following six main points before operation:
With the development of demand in buildings, roads and other markets, concrete mixing plant is applied more widely, as a high-return investment projects, investors need to know about before Website mixing plant siting process.
At present, the concrete mixing plant is developing towards the direction of energy conservation and environmental protection.After the concrete mixing plant emerged last century, it has been updated for several generations, but there’s still some existing problems in the process of the development of concrete mixing plant.these problems hindered the development of mixing plant industry.I summarized some points to introduce to all of you .
Concrete batching plant is composed of main plant structure, concrete mixer, cement silos, screw conveyor, belt conveyor, weighing system, fluid supply system, air supply system, electric control system, dust removing system, control room, etc.(The practical configuration will be customized in line with customers’ requirements.)
Reversing drum concrete mixer is also named civilian concrete mixer and it is also a common type concrete mixer in our daily life. Though reversing drum concrete mixer is very easy to operate, users should notice daily operation in order to give full play to the benefits of reversing drum concrete mixer which also can prolong the service life and save the use costs.
During operation process of concrete mixer, we need check whether the clearance between mixing blade and mixing drum bottom and side of forced type concrete mixer conforms meets requirements. If the clearance exceeds standard, it can thicken the remaining concrete in the wall and bottom of mixing drum, which will increase the difficulty of the cleaning work and reducing the mixing efficiency. If the mixing blades are worn, we need timely adjust, repair and replace it.
Firstly, all parts should be checked whether there is leakage after the tires have been inflated strictly according to standards of tire inflation, what’s more, tire pressure must be inspected regularly to ensure that it conforms to criterion. Barometer rather than naked eyes is the normal tool to measure atmospheric pressure. In the process of driving, with particular elasticity, the tires will not deform seriously when bearing normal loading, which can guarantee stability and conformity of concrete mixer. To avoid deflating after a spell, atmospheric pressure of spare wheel should be very sufficient.
In the process of construction, materials expenses can possess 60% of the total construction cost. With such high proportion, daily material management and usage must be valued; besides, materials expense, which consists of amount and price of materials, should be controlled. In the construction, restrict on amount and price of materials play an important role on reducing cost and improving work efficiency, so efficient control system and supervisory system should be enacted during the process of purchasing material.